From | Client | Project | Equipment | Service |
---|---|---|---|---|
2010 | GASCO | HABSHAN-5 | Pressure Vessels & Clad Vessels | Inspection |
2010 | SATORP | Jubail Export Refinery | FCC Tower and Pressure Vessel | Inspection |
2010 | SATORP | Jubail Export Refinery | Low alloy Heat Exchangers | Inspection |
2010 | SATORP | Jubail Export Refinery | Air Cooled Heat Exchangers | Inspection |
2010 | SKEC | Jubail Export Refinery | Copper & Nickel Heat Exchangers | Inspection |
2010 | SKEC | Jubail Export Refinery | Air Dryer Packager Unit | Inspection |
2010 | CTCI | Jubail Export Refinery | Air Dryer Packager Unit | Inspection |
2010 | KUMHO / Daelim Industrial Co., LTD | KPA-III Project | Centrifugal Pumps | Inspection |
2010 | Assmang Iron Ore | KEP 16MT | 6,000 tph ROM Stacker, 3,800 tph ROM Reclaimer | Inspection |
2010 | MGR/L&T | Vemagiri - 2 | HRSG (15 Modules-Vertical Type) | Survey for factory, foundry |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2011 | SECL/ UAE SHAH GAS | UAE SHAH GAS Development Package 4 Utilities & Offsites | Chilled Water Refrigeration Package | Inspection |
2011 | Petrofac | South Yoloten Gas Development | Air Cooled Heat Exchangers | Inspection |
2011 | TRACTEBEL ENGINEERING BELGIUM | Chilcauno Power Station ADD-ON Project | Heat Recovery Steam Generator (HRSG) | Inspection |
2011 | Hitachi Plant Technologies, Ltd. (HPT) | SSP Project | Pressure Vessels | Inspection |
2011 | Kuwait Oil Company | MAA to Sabiya and Doha Power Stations | DPDU Refrigerant Transfer Vacuum Pump | Inspection |
2011 | SK E&C / SK Lubricants | H project | Centrifugal pumps | Inspection |
2011 | KOC/SK E&C | BS-132 | Air Cooled Heat Exchangers | Inspection |
2011 | BV-China | Zhejiang Ningbo LNG Terminal | Air Release and Vacuum Break Valves | Inspection |
2011 | The Consortium of AI Arrab Contracting Company and SEPCO III | RAS Az Zawr Power and Desalination Plant – Phase 1 Package Power Plant | Heat Recovery Steam Generators (HRSG) | Inspection |
2011 | PDO/GS E&C | SNDC Phase-1 | Air Cooled Heat Exchangers | Inspection |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2012 | SECL / Samsung Total | No. 2 Aromatic Complex | Air Cooled Heat Exchangers | Inspection |
2012 | Turkish Petroleum Refineries Corporation | IZMIT Refinery Resid Upgrading PJT | Heavy Wall Vessel, Alloy Shell & Tube H/E, Shell & Tube H/E Hydrogen Unit | Inspection |
2012 | Shell Development Australia (SDA) | Prelude Floating LNG Project | Marine Bolier (Steam drums, Economizer Heater, Super heater, EVA Header etc) Riser and Feeder connecting pipes | Inspection |
2012 | GLIS-Korea/Israel EC Ltd | RAMAT, HOVAV Unit 9 | Boiler Feed water pumps | Inspection |
2012 | Hyundai E&C / JRC | Jurong Rock Cavern Phase 1 | MOV Butterfly valves (Double/Triple type) | Inspection |
2012 | GLIS-Korea/Israel EC Ltd | Orot Rabin Power Station #5 & #6 | Motor for Vacuum Belt Filters | Inspection |
2012 | ARAMCO | Yanbu Export Refinery PJT | Atmospheric Column, Kerosene Strippers | Inspection |
2012 | SKE&C / ARAMCO | WASIT #1, #3 and #4 Project | Air Cooled Heat Exchangers | Inspection |
2012 | Techicas Reunidas | Guang-Dong Zhuhai LNG Project - Phase 1 | Cryogenic Butterfly Valves | Inspection |
2012 | GL Abu Dhabi / Dodsal E&C | Habshan Sulphur Granulation | Carrying Idler & Stand | Inspection |
2012 | SKE&C / ARAMCO | Yanbu Export Refinery EPC-2 | Casting Valves of Carbon Steel, Low alloy Steel and Stainless steel | Inspection |
2012 | Ministry of Oil State Co., BAGHDAD, IRAQ | Oil projects (SCOP) | Casting Valves of carbon steel | Inspection |
2012 | SKE&C / ARAMCO | Yanbu Export Refinery EPC-2 | Air Cooled Heat Exchangers | Inspection |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2013 | SCI/Tecnicas Reunidas | Gran Chaco Project | Air Cooled Heat Exchangers | Inspection and Expediting |
2013 | SECL / Samsung Total | No. 2 Aromatic Complex | Refrigerant Unit | Inspection |
2013 | ALSTOM/Hydro-Quebec | Beauharnois Centrale 1 & 3 | Crown, Band & Hub | Inspection |
2013 | Daelim / Korea East-West | Ulsan #4 Combined Cycle | Fuel Gas Compressors (65,000 kg/hr) | Inspection |
2013 | Daelim / Korea Western P. | 2nd Pyeongtaek CCPP | Fuel Gas Compressors (62,000 kg/hr) | Inspection |
2013 | Tecnimont / Braskem-Idesa SAPI | Etileno XXI-LDPE Plant | Welded Stainless Steel pipes | Inspection |
2013 | Daelim Industrial CO. | Po-Cheon LNG Power Plant | Steam Turbine Generator and auxiliaries | Inspection |
2013 | SCI/TR | VGO Project | Air Cooled Heat Exchangers | Inspection/Expediting |
2013 | GS E&C | UHV Project | Air Cooled Heat Exchangers | Inspection |
2013 | SK E&C | WASIT #1 –ADD Project | Air Cooled Heat Exchangers | Inspection |
2013 | Chevron | Lianzi Development | Manual Valves | Inspection |
2013 | SCI/Tecnicas Reunidas | Gran Chaco Project | Air Cooled Heat Exchangers | Inspection and Expediting |
2013 | SECL / Samsung Total | No. 2 Aromatic Complex | Refrigerant Unit | Inspection |
2013 | ALSTOM/Hydro-Quebec | Beauharnois Centrale 1 & 3 | Crown, Band & Hub | Inspection |
2013 | Daelim / Korea East-West | Ulsan #4 Combined Cycle | Fuel Gas Compressors (65,000 kg/hr) | Inspection |
2013 | Daelim / Korea Western P. | 2nd Pyeongtaek CCPP | Fuel Gas Compressors (62,000 kg/hr) | Inspection |
2013 | Tecnimont / Braskem-Idesa SAPI | Etileno XXI-LDPE Plant | Welded Stainless Steel pipes | Inspection |
2013 | Daelim Industrial CO. | Po-Cheon LNG Power Plant | Steam Turbine Generator and auxiliaries | Inspection |
2013 | Daelim Industrial CO. | Po-Cheon LNG Power Plant | Emergency Diesel Engine Generator | Inspection |
2013 | SKE&C / Hanam | Hanam CHP | Heat Recovery Steam Generator (HRSG) (1 Unit, 398 MW) | Inspection |
2013 | SKE&C / Tufanbeyli | Thermal Power Plant (3 units x 150 MW) | Pipe Spool of WET SCRUBBER | Inspection |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2014 | JVD/SK E&C | NSPR Project | Big towers and heavy wall pressure vessel | Inspection |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2015 | SEPCO | Master Gas System Expansion Phase 1 | Air Cooled Heat Exchangers | Inspection |
2015 | TOTAL | KAOMOB Project | HVAC System of FPSO | Inspection |
2015 | EXERGY | GEX1300-Saray 12MW Geothermal Power Plant | Heat Exchangers | Inspection/Expediting |
2015 | Daelim | OCU Project | Centrifugal Pumps | Inspection |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2016 | Dodsal / KOC | GC-29, GC-31, Project | Bronze Valves | Inspection |
2016 | Dodsal / KOC | EWTIP Project | MOV Gate, Globe Valves | Inspection |
2016 | PDO/PECO | Rarab Harweel project | Air Cooled Heat Exchangers | Inspection |
2016 | KOC/Dodsal | Effluent Water Treatment and Injection plant (NK) | Pipe Spools, Valves, Pumps | Inspection |
From | Client | Project | Equipment | Service |
---|---|---|---|---|
2017 | ARAMCO/L&TH, EMAS | SFNY 4 Decks, Subsea Pipelines & Cables and STP-17 69 KV Circuit Breaker PJT PROJECT | Welded pipes | Inspection |
2017 | CCJV | LPIC EPC1 SCU | Plate & Frame heat exchangers | Inspection |
2017 | TECHINCO | SADAF and SIRAF Project | API Centrifugal Pumps Sea water pump and Cooling water pumps | Inspection |
2017 | FDH JV | Al Zour Project | Temperature Control Packages | Inspection |
2017 | PETRONAS | RAPID Project | Refrigeration Packages | Inspection |
2017 | JGC | CGP-3, MHD and SITRA project | Butt weld Fittings | Inspection |
2017 | Daewoo | RUC Project | Air Compressors | Inspection |
2017 | Daelim | RUC Project | On-Off Valves and Air tanks | Inspection |