Data Centres
Power, cooling and containment equipment for data halls — switchgear, UPS systems, chillers and generator sets, usually on a compressed schedule.

Data-hall equipment — switchgear, UPS systems, chillers and generator sets — is bought on a compressed schedule and must work on day one, because commissioning windows are short and downtime is the whole risk. Factory acceptance testing at the vendor is where that reliability is proven.
PSPP witnesses FAT on power and cooling equipment, inspecting switchgear, UPS, chillers and gensets to IEC/IEEE and the client's specification, and verifying the electrical, functional and documentation records before despatch.
Challenges
Compressed delivery schedules
Short commissioning windows mean a late nonconformity has an outsized impact on go-live.
Electrical FAT and function
Switchgear, UPS and gensets need routine electrical and functional tests witnessed before shipment.
Cooling equipment performance
Chillers and cooling packages are performance-tested to confirm capacity before despatch.
Our Solutions
Electrical FAT witnessing
Witness of switchgear, UPS and generator factory acceptance and routine tests.
Performance test witnessing
Attendance at chiller and cooling-package performance tests.
Progress monitoring
Expediting on compressed-schedule equipment to protect go-live.