- Home
- Industries
- Food Processing
- LS-02
Food Processing
Processing, filling and packaging lines — stainless fabrication and hygienic design verified before the line is shipped and commissioned.

Food processing, filling and packaging lines are built in stainless steel to hygienic-design rules, and acceptance rests on surface finish, cleanability and function proven before the line is shipped and commissioned. Catching a hygienic-design or weld defect at the vendor avoids a shutdown later.
PSPP inspects stainless fabrication and hygienic design on processing and packaging equipment, witnessing functional and dimensional checks and reviewing material and surface-finish records before shipment.
Challenges
Hygienic design & stainless fabrication
Surface finish, weld quality and drainability must be verified on product-contact equipment.
Line function & completeness
Processing and packaging lines are inspected for function and completeness before despatch.
Material traceability
Stainless grades and product-contact materials need certificate verification.
Our Solutions
Fabrication inspection
Welding, surface-finish and dimensional inspection of stainless equipment.
Functional & completeness checks
Functional and completeness verification of lines before shipment.
Documentation review
Material and surface-finish record verification.