Skip to content
3B PSPP
  • LS-02

Food Processing

Processing, filling and packaging lines — stainless fabrication and hygienic design verified before the line is shipped and commissioned.

Automated filling line in a processing plant
Industries

Food processing, filling and packaging lines are built in stainless steel to hygienic-design rules, and acceptance rests on surface finish, cleanability and function proven before the line is shipped and commissioned. Catching a hygienic-design or weld defect at the vendor avoids a shutdown later.

PSPP inspects stainless fabrication and hygienic design on processing and packaging equipment, witnessing functional and dimensional checks and reviewing material and surface-finish records before shipment.

Challenges

Hygienic design & stainless fabrication

Surface finish, weld quality and drainability must be verified on product-contact equipment.

Line function & completeness

Processing and packaging lines are inspected for function and completeness before despatch.

Material traceability

Stainless grades and product-contact materials need certificate verification.

Our Solutions

Fabrication inspection

Welding, surface-finish and dimensional inspection of stainless equipment.

Functional & completeness checks

Functional and completeness verification of lines before shipment.

Documentation review

Material and surface-finish record verification.