Skip to content
3B PSPP
  • PSI
  • Inspection

Pre-Shipment Inspection

Turbine hall of a power generation plant
Capabilities

A final independent check of goods before they leave the manufacturer's facility, confirming quantity, specification conformity, and physical condition against the purchase order and approved documentation, so clients aren't the first to discover a problem after the goods have shipped.

A pre-shipment inspection (PSI) is the last independent gate before goods leave the factory: quantity, specification and condition are checked against the purchase order and the approved QCP/ITP, and any open nonconformity is confirmed closed. It is the check that stops a problem travelling to site inside a sealed crate.

Key Highlights

  • Final quantity and specification verification against the purchase order
  • Physical condition and workmanship check
  • Cross-check against approved QCP/ITP and inspection release notes
  • Independent, unbiased reporting before goods leave the factory